Owner: Ministry of defense
Main Contractor: First United for Buildings Company (FUBC)
Consultant:
– Design: Nizar Al-Angari Office
– Supervision: Al-Sayegh Office
Scope of Work:
• Construction of 5 Building
• Supply and install a transformer with HT cable connection.
• Execute electrical works, including generator supply and commissioning.
• Supply and install low–voltage systems (cameras, alarms, phones).
• Install, test, and energize lighting fixtures


